meg.mugzyboez.co
Workspace
Working docs, drafts, and reference materials. Campaign Operations at RCA Records.
TEMPO →
Portfolio →
Ready / Shareable
Working Draft
Reference
Up Next
This Week
March 24–28
Campaign Ops ↔ Campaign Leads Handoff Map
What flows where and who touches it. Jordan flagged as urgent.
Draft
Mar 24
30-Day Plan
March 24 – April 25. Make it impossible to imagine RCA without Campaign Ops.
Ready
Mar 23
Workability Snapshot — March 23
113 releases. SAA Unknown on 100%. The proof point for RDX.
Ready
Mar 23
For Jordan
Queue
RDX: What I Found, What I Need
One-pager for Jordan. What works, what's blocked, two asks, what it unlocks.
Ready
Mar 24
30-Day Results One-Pager
Week 4 deliverable. The receipts — meetings processed, signals surfaced, items flagged.
Week 4
Apr 18
Reference
Always on
RDX Playground Queries
Copy-paste queries for workability cross-reference. ISRCs from March 23 export.
Reference
Mar 23
RDX Reference Guide
Full schema map, confirmed queries, field mappings, playground tips.
Reference
Mar 21
Artist Insights — Crawley Rules
Editorial rules, V2–V6 feedback, color system, scorecard build order.
Reference
Mar 22
Deliverables Inventory
Everything built since February. Where it lives. Current status.
Reference
Mar 22
Stakeholder Coalition Map
Who's who, relationship status, turf sensitivity, comms preferences.
Reference
Mar 22